Rm. Valcea (Romania) – Pobla de Mafumet (Spania) Project

It was carried 6 tanks of various size out of which the biggest had 10.50 x 4.20 x 4.50 m / 45 tons.
These tanks have been carried as follows:

  • by road from Rm.Valcea to Constanta Port, using 6 adeqvate trailers;
  • indirect transhipment trailers – quay- vessel in Constanta Port/ Umex berth (including stored);
  • sea transport from Constanta Port to Tarragona Port (Spain)
  • indirect transhipment vessel – quay – trailers in port of Tarragona
  • road transport Tarragona Port La Pobla de Mafumet job site using 6 trailers


View Larger Map