Project Novargi / Arab Petroleum Pipelines, Alexandria, Egypt

The object of the project was the road transport from the Buzau based supplier HPM up to Constanta port, the indirect transshipment from FOT – port storage area – FOB maritime vessel, lashing / securing / dunnaging and survey of 1 cargo lot of 14 packages / 255 tons / 865 cbm.

The cargo lot included 2 overdimensional and overweight packages, each with the following dimensions / GW: SKID / 13.80 x 3.02 x 4.56 m / 64,247 kg.

Cargo was loaded onto mv Lucky Joy with the Liebherr quay cranes from Umex terminal – 2 cranes of 104 to capacity each – and had as port of destination Alexandria, Egypt.